Index page [<< First] [< Previous] [Next >] [Last >>]
of 339
Progress! Openings have been cut out for the bathrooms. Also uncovered - the lettering on the back wall was advertising on the Wine Bar building back BEFORE the 2nd level of the bank was built. Kinda cool.
building-IMG_1461.JPG